manufacturing

REC SILICON – MOLALA LAB

The project is a new, stand-alone, 11,400 Square Foot Research and Development Laboratory building on the Moses Lake Campus of REC Silicon. The building exterior is comprised of Composite Metal Panels offering the building a sleek and clean appearance. The interior is a mix of Laboratory areas and offices.

THE PROJECT CONTAINS SOME UNIQUE CHALLENGES WITH THE RELOCATION OF VARIOUS EQUIPMENT FROM OTHER FACILITIES AND THE COORDINATION OF INFRASTRUCTURE TO SUPPORT THE EQUIPMENT.

  • Status: Complete
  • Sq. Ft.: 11,400
  • Duration: 10 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Guaranteed Maximum price

Nelson Irrigation Bldg #9

New construction of a large manufacturing warehouse which will house many large ovens that melt and mold plastic into sprinkler parts.

This pre-engineered metal building features structural steel mezzanines, (2) 10-ton bridge cranes, and small office and staff areas.

  • Status: Complete
  • Sq. Ft.: 36,000
  • Duration: 13 Months of construction
  • Project Delivery Method: Design/Build
  • Contract Type: Cost plus with a GMP

TISPORT

Renovation of a vacant grocery store into a manufacturing facility allowing for a local business to expand. 

several Building systems required complete replacement to accommodate the new use.

  • Status: Complete
  • Sq. Ft.: 69,045
  • Duration: 5 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Guaranteed Maximum price