pre-k & k-12

Amon Creek Elementary

The facility is a 2 story, K-5 education facility, 38 classrooms, gym, cafeteria, library, music room, flexible learning space, computer lab, two reading rooms, and playground.

Site improvements include but are not limited to parking lots, curbs, sidewalks, and landscaping.

Pre-K & K-12
  • Status: Complete
  • Sq. Ft.: 76,650
  • Duration: 15 Months
  • Project Delivery Method: Bid/Build
  • Contract Type: Lump Sum

DESERT SKY ELEMENTARY

The facility has 24 regular classrooms, four classrooms for special education services, designated spaces for music and art, a gym, multipurpose room, administrative office and a playground.

This new elementary school will house approximately 600 students.

Pre-K & K-12
  • Status: Complete
  • Sq. Ft.: 65,000
  • Duration: 17 Months
  • Project Delivery Method: Bid/Build
  • Contract Type: Lump Sum

BLOSSOMS EARLY LEARNING CENTER

New Ground-Up 6,440 SF Pre-School and Early Learning facility on the previously undeveloped ground. The project is a prototype of a facility that Chervenell built in Yakima, WA in 2016. It is anticipated that a 3rd of these facilities will soon follow and is likely to be negotiated with the selected contractor for this facility.

The facility is a wood framed structure on a slab-on-grade. Exterior finishes include but are not limited to fiber cement siding and glass. Site improvements include but are not limited to parking lots, curb, sidewalk, and landscaping.

Pre-K & K-12
  • Status: Complete
  • Sq. Ft.: 6,440
  • Duration: 6 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Lump Sum

prosser High School

The new Prosser High School located in Prosser, WA directly above Ark Fiker Stadium. This project is a brand new 170,000 SF building on 36 acres which include a new baseball and soccer complex with improvements to existing soccer and softball facilities. This project is very unique in that it has 3 different slab on grade elevations (all build into hillside which required rock hammering for all excavation activities), 1,086 pieces of precast panels and over 5,000 CY of cast in place concrete.

The classroom wing compiles 47 teaching spaces that span over 3 floors. The commons is a large open space with polished concrete floors which ties the admin and kitchen to the classroom wing. With several shop areas (woodshop, metal shops, greenhouses and associated classrooms), the students of Prosser High School will have every opportunity to develop CTE skills as they see fit. This new high school will house approximately 900 students.

Pre-K & K-12
  • Status: Complete
  • Sq. Ft.: 170,000
  • Duration: 30 Months
  • Project Delivery Method: Bid/Build
  • Contract Type: Lump Sum