HERITAGE – PETRIE HALL REPLACEMENT

This project consists of construction of three higher educational facility buildings and associated site improvements located on the existing Heritage University Campus. The work generally consists of three single-story brick veneer wood framed bearing wall buildings of approximately 28,500 square feet with reinforced concrete foundations, concrete floor slabs, wood framed structural walls, wood framed interior partitions and soffits, glue laminated roof structure with pre-finished metal roofing and trim.

Site work includes demolition of existing structures, grading and excavations for the building construction along with domestic water and sanitary sewage systems, site paving and site utilities.

Higher-Ed
  • Status: Complete
  • Sq. Ft.: 28,500
  • Duration: 6 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Lump Sum

HERITAGE – phase II buildings

Site work includes demolition of existing structures, grading and excavations for the building construction along with domestic water and sanitary sewage systems, site paving and site utilities.

Due to the complexity of the occupied campus, Chervenell was able to coordinate with Heritage University to assure the rest of the campus was not impacted and the schedule still maintained.

Higher-Ed
  • Status: Complete
  • Sq. Ft.: 8,000
  • Duration: 4 Months
  • Project Delivery Method: Design/Bid/Build
  • Contract Type: Lump Sum

CBC – SSWL

The Columbia Basin College Social Sciences and World Languages project has several unique design features including a curved Curtainwall system at the entry, multi-level round lecture halls in the center, and open connections between the floors.

New 3-Story Higher Education building on the expanding CBC Campus.

Higher-Ed
  • Status: Complete
  • Sq. Ft.: 67,000
  • Duration: 16 Months
  • Project Delivery Method: Bid/Build
  • Contract Type: Lump Sum