office

GRANDRIDGE 1 – TIPPETT BUILDING

New office building that is the home of Clifton Larson Allen and Ticor Title

Office
  • Status: Complete
  • Sq. Ft.: 19,532
  • Duration: 6 Months
  • Project Delivery Method: Design/Build
  • Contract Type: Guaranteed Maximum Price

Tri-City Business and Visitor Center

Located adjacent to the Tri-Cities Convention Center, this building is home to the Tri-City Development Council (TRIDEC), the Tri-Cities Visitor and Convention Bureau, and the Tri-City Regional Chamber of Commerce. We are proud to have been selected to build for these community leaders.

THE STRUCTURE CONSISTS OF A ONE STORY OFFICE BUILDING WITH THREE SEPARATE OFFICE SUITES RANGING IN SIZE FROM 3,000 TO 4,500 SF.

Office
  • Status: Complete
  • Sq. Ft.: 14,650
  • Duration: 6 Months
  • Project Delivery Method: Design/Build
  • Contract Type: Lump Sum

Cascade Natural Gas

The two stories above grade extended beyond the 7,000 SF basement. The basement includes storage areas, mechanical and IT systems. The upper floors are set up with a combination of private offices, open floor space, and conference rooms.

The lower floor includes a covered patio for employee use and the upper floor contains an exterior patio off of the conference room for events.

Office
  • Status: Complete
  • Sq. Ft.: 26,000
  • Duration: 8 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Guaranteed Maximum Price