retail

LEP-RE-KON FOODS CONNELL

This phased project included the construction of a new grocery store directly behind an existing store which remained open during construction. The new building included CMU, metal wall panels, MEP, and interior finishes. 

Once the new store was completed, the existing was demolished and replaced with a new parking lot.

  • Status: Complete
  • Sq. Ft.: 23,400 SF​
  • Duration: 16 months
  • Project Delivery Method: Lump Sum
  • Contract Type: Lump Sum

LITHIA

Careful consideration and planning were completed to allow for the entire project to be constructed while all aspects of the business remained open to the public.

THIS MULTI-PHASED RENOVATION PROJECT WAS COMPLETED OVER 3 PHASES IN 12 MONTHS.

  • Status: Complete
  • Sq. Ft.: 27,000
  • Duration: 12 Months
  • Project Delivery Method: Design/Build
  • Contract Type: Guaranteed Maximum Price

PERFECTION GLASS

New Showroom, Shop, and storage facility to allow for a local business to expand operations to multi-locations.

  • Status: Complete
  • Sq. Ft.: 16,620
  • Duration: 4 Months
  • Project Delivery Method: GC/CM
  • Contract Type: Guaranteed Maximum Price